"The Rogerson Reports"

After months and months of testing and analyzing, here is the summary of the PFA's findings on the construction of the Horizon 1. The first report is the required Flight Test Schedule with the performance figures of John Rogerson' plane "G-DOGZ". The second report is the modifications being required by the PFA.  John Rogerson implemented these mods into his plane.  The files are somewhat large but that was required to maximize the clarity of each page contained herein.

 

Flight Test Schedule

Page 1

Page 2

Page 3

Page 4

 

PFA Required Modifications/Drawings

Page 1

Page 2

Page 3

Page 4

Page 5